IntroductionThe Field Interface Unit (FIU) provides the communications hardware link between the SiteProTMcentral computer, the SiteProcompatible fiel
Note: The Motorola radio service software screens shown inFigure 12, 13, and 14 are for example only. Later servicesoftware versions may not be format
Radio-Link System Setup1. Reconnect power to the FIU and switch on all components. The central computer should be booted up and the SitePro pro-gram o
SitePro Central Decoder System ConnectionThe SitePro Central Decoder System (CDS) program works in conjunction with the SitePro Field Interface Unit M
45665427Pin 2Pin 2Pin 1Pin 12331Figure 16 - DIU Connection OverviewFigure 17RJ45 Cable to Wall Plate13YellowYellowYellowGrayGrayGray1 - Surge Protecti
14Figure 18 - Illustrated Parts Listing, FIU Models 2010, 2020, 2011 and 2021See Detail BSee Detail CDetail BDetail CPhone JackView A-A(Bottom View of
15Item No. Part No. Description QuantityPer Assy.Refer to Figure 18 for the following items:1 - - - - - - - Housing, SNCX, FIU 12 - - - - - - - Brac
TroubleshootingIf a malfunction occurs, follow the suggested steps to identify and fix the problem. If the problem cannot be resolved theremay be a pr
6557158910111316141718201219222123241234Figure 2 - Model 2020 (two wireline ports)1 - Central Computer2 - Field Interface Unit 3 - COM Port 14 - COM P
3671389101114151618171912122035542124232526 221 - Central Computer 2 - Field Interface Unit 3 - COM Port 1 4 - COM Port 25 - DB-9/DB-9 Serial C
781917910121113202122242325272628126661814163451531303233291 - Central Computer2 - Field Interface Unit3 - COM Port 14 - COM Port 25 - COM Port 36 - D
Installing the Field Interface Unit, Wall Plate Assembly and Surge Protection Unit 1. Position the Field Interface Unit within 6' (1.8 m) of the
7. A 25' (7.6 m) length interface cable is supplied for the connection of the modular wall plate to the SPU. Select an installa-tion site for the
Procedure1. Drive a 5/8" (16 mm) by 8' (2.5 cm) copper-clad steelground rod into well-moistened soil not more than 8' (2.5 cm) from the
Communication Cable TestCorrect installation of the communication cable is essential for proper operation of the wireline control system. The communi-
Processor Ready: Indicator light will illuminate when the microprocessor in the FIU has received configuration instructionsfrom PC and is ready to com
Comentários a estes Manuais